Client:
Bovingdon Studios
Utility Line completed the design, supply and installation of the LV intake cables from an existing 11kv substation.
This project consisted of:
- LV design for LV cables from Stage B, C & D package substation 1250kva – 1500kva cable end box to client LV panel
- Supply and installation of LV cables from Stages B, C & D to LV intake rooms next to existing substations
- Complete all cable terminations
- Complete LV cable test and energisation to client ACB only